top of page
Kings Square 4

Lynx were engaged to deliver the Building Automation Solution for the new headquarters for HBF, WA's largest health insurer - with approximately 13,000sqm of A-Grade commercial office space over 10 levels.

Lynx's scope of works was to Design and commission a complete Building Automation System solution to the 13,000 square metre building.

Solution included user control ‘GUI interface’, control of all lighting, monitoring of the Exit & Emergency lighting and integration with the Building Management System & security system.

Applications which included were a combination of local control, timed control, PE cell control, present detection, remote and automated control, day light harvesting and a fully monitored Exit and Emergency lighting system to the entire project.

Special features -

  1. The use of DALI light fittings & Emergency light fittings on the one system.

  2. Targeting a 5 Star Green Star and a 5 Star NABERS Energy rating.

 

Advantages included-

  • Increased energy savings

  • Distributed intelligence for flexible & reliable control

  • Control of individual lights

  • Status reporting on lamps and ballasts

  • Simple modifications – no need to alter 240volt wiring

  • Lower maintenance costs

 

The Result - state of the art energy efficient Building Automation System giving the client complete control.

bottom of page